No More Mountains To Cross Art Gallery Home 
McClellan Butte
Picture: McClellan Butte

The engineer on heavy eastbound Train No. 200 has the throttle in run 8 as  he rounds the big curve below McClellan Butte.  The train is at milepost 2127,  on the west side of Snoqualmie pass, and all 9,000 horsepower in the consist will be needed to move the tonnage up the 1.74% grade


E-mail The Administrator